The Shed Update

IMG_4110Finishing touches on the outside of our new building, “The Shed,” continue this week with sidewalks.  John Whittemore’s concrete crew is replacing the ramps to the main building and placing new sidewalks.  The design calls for sidewalks that create outdoor exhibit spaces for durable machinery.  The exterior wall of the building will be a sturdy backdrop for signs and description too.

A few personalized imprints were left in the concrete.  The date of the work is a frequent message left in building projects.  We imprinted a few leaves and flowers near the fossil rock too.  Minnewaska Schools Sixth Grade will be here next week to put the latest work to the test!IMG_4117

Advertisements

About popecountymuseum

This blog is primarily written by Ann Grandy, Assistant Curator.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s